question

AlexKlap avatar image
AlexKlap asked

SSRS Linked Report Deployment

i have designed linked report using SSRS 2014 Data Tools. now i have to deploy the linked report to production. how can user consume the linked report from production area. what is the best approach. Kindly share your thoughts. Thanks a lot
ssrsssrs-2008-r2
10 |1200

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.

1 Answer

·
Jon Crawford avatar image
Jon Crawford answered
that's a pretty open-ended question, you say you've developed the report and deployed to production, do you not want to share the production SSRS report server link with your user?
10 |1200

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.